Before timber production: turn open questions into next steps.

“Almost agreed” is difficult information to manufacture from. Use this review to establish what is recorded, what is still open and who takes the next step.

One shared record. Ready to edit.

Download the CSV template for Excel, Numbers or Google Sheets. Includes all nine review topics, status, evidence, next action, responsible person and due date.

A useful coordination review is not a row of green ticks. It tells the team which decision is recorded, which information is missing and who will resolve it. That makes the next conversation shorter and more productive.

Use this guide with the architect, timber contractor and relevant specialists. It is a practical conversation structure; the project team remains responsible for the actual design, checks and approvals.

Nine topics. One shared record.

For each topic, record the status, the drawing or evidence, the person responsible and a due date. “Not applicable” is a valid answer when the team has agreed why.

Review topicUseful evidence / next step
1. Structural concept agreedAgreed system and structural assumptions.
2. Openings fixedCoordinated opening sizes and reference drawing.
3. Critical services coordinatedServices routes and penetration positions.
4. Fire requirements reflected in detailsProject fire strategy reflected in the details.
5. Acoustic build-ups agreedBuild-ups and junction assumptions agreed with the specialist.
6. Airtightness & moisture strategy resolvedContinuous layers and responsibilities identified.
7. Concrete & steel interfaces coordinatedDimensions, levels and tolerances agreed.
8. Visible-surface requirements definedAppearance expectations and protection defined.
9. Transport & installation constraints consideredAccess, lifting and assembly sequence reviewed.

Excel (.xlsx) · Original supplied checklist · No newsletter signup.

Make the review useful.

  • Ask each discipline to update only the information it owns.
  • Prioritise open points that could change geometry, build-ups or the production sequence.
  • Name one next action and one owner for each unresolved item.
  • Review the evidence together before the formal production approval.

More resolved early. Less left to chance.

These coordination questions exist in construction regardless of the material. Prefabrication makes it worthwhile to answer them before production: the agreed information can then shape the elements that arrive on site. The benefit is a better-prepared build and a clearer route from design to finished result.