Cutting and adjusting on site.
Mismatched dimensions slow down assembly.
More ready to fit.
We check dimensions and tolerances before production, reducing avoidable adjustments on site.

From the first coordinated drawing to checked timber work on site: one connected route, with a clear purpose at every stage.
Clear decisions give each team what it needs. You gain a more predictable route from drawings to usable space.
Priorities, dimensions, performance, responsibilities and approvals establish one agreed basis for the timber work.
The workshop works from coordinated production information. Components, connections and specified layers are made and checked before delivery.
Confirm foundations, dimensions, access, lifting and protection. Load and deliver in the order the assembly team needs.
Check fit, fixings and interfaces as the work progresses. Record outstanding actions and agree the information and care guidance for handover.
See the people, machinery and workshop behind the elements. The original Bächi Holzbau film shows the work in practice.
Geometry, layers and openings become production information.
Cut components, prepare connections and build up the element.
Confirm the agreed details, protect and load in sequence.
Small issues can become site delays. Bächi Holzbau checks the details early to protect your time, your design and the finished result.
Mismatched dimensions slow down assembly.
We check dimensions and tolerances before production, reducing avoidable adjustments on site.
Unclear connections and responsibilities leave work unfinished.
We agree supports, fixings and who completes each interface, so the next team can move forward.
Late clashes between structure, insulation and services force changes.
We coordinate structure, services, fire, acoustics and moisture and thermal protection before fabrication.
Unprotected timber can need repairs before handover.
We agree surface quality and protect the elements through loading, transport and assembly.
Unresolved items become extra follow-up for you.
We check fit and connections, assign outstanding actions and hand over care information.
Three things ready. One coordinated programme. A clearer date to plan around.
The right elements.
In the right order.
Follow-on trades, fit-out and final checks complete the route to handover.
Your move. Your opening.We coordinate the whole route to your target date, from design to handover.
Discuss my project timelineSee how timber, insulation and a well-planned roof can work harder for your home and the environment.