Agreed on paper.
Built with confidence.

From the first coordinated drawing to checked timber work on site: one connected route, with a clear purpose at every stage.

Every step protects
the next one.

Clear decisions give each team what it needs. You gain a more predictable route from drawings to usable space.

  1. 01

    Agree the scope.

    Know what is included before production starts.

    Priorities, dimensions, performance, responsibilities and approvals establish one agreed basis for the timber work.

  2. 02

    Make and check.

    Resolve the detail while it is easy to reach.

    The workshop works from coordinated production information. Components, connections and specified layers are made and checked before delivery.

  3. 03

    Deliver in sequence.

    Keep the site moving when the elements arrive.

    Confirm foundations, dimensions, access, lifting and protection. Load and deliver in the order the assembly team needs.

  4. 04

    Assemble and hand over.

    Give the next trades a clear starting point.

    Check fit, fixings and interfaces as the work progresses. Record outstanding actions and agree the information and care guidance for handover.

From digital model
to finished element.

See the people, machinery and workshop behind the elements. The original Bächi Holzbau film shows the work in practice.

Bächi Holzbau × H&B Real EstateGerman audio · English subtitles

  1. 01

    Coordinate the model

    Geometry, layers and openings become production information.

  2. 02

    Machine & assemble

    Cut components, prepare connections and build up the element.

  3. 03

    Check & prepare for delivery

    Confirm the agreed details, protect and load in sequence.

Check it before
it costs time on site.

Small issues can become site delays. Bächi Holzbau checks the details early to protect your time, your design and the finished result.

If left unresolved

Cutting and adjusting on site.

Mismatched dimensions slow down assembly.

With Bächi Holzbau

More ready to fit.

We check dimensions and tolerances before production, reducing avoidable adjustments on site.

If left unresolved

One trade waiting for another.

Unclear connections and responsibilities leave work unfinished.

With Bächi Holzbau

Clear connections. Clear responsibilities.

We agree supports, fixings and who completes each interface, so the next team can move forward.

If left unresolved

Layers that compete for space.

Late clashes between structure, insulation and services force changes.

With Bächi Holzbau

A build-up that works as one.

We coordinate structure, services, fire, acoustics and moisture and thermal protection before fabrication.

If left unresolved

Damage to the finish you chose.

Unprotected timber can need repairs before handover.

With Bächi Holzbau

Your chosen finish, protected.

We agree surface quality and protect the elements through loading, transport and assembly.

If left unresolved

Loose ends at handover.

Unresolved items become extra follow-up for you.

With Bächi Holzbau

A clear finish. Less chasing.

We check fit and connections, assign outstanding actions and hand over care information.

What sets the build time?

Three things ready. One coordinated programme. A clearer date to plan around.

Ready before assembly

  • Design agreedDecisions & permissions settled
  • Elements readyMaterials & workshop slot secured
  • Site readyFoundations, access & crane coordinated
The planned window

Deliver.
Assemble.
Close the envelope.

The right elements.
In the right order.

Ready to use

Follow-on trades, fit-out and final checks complete the route to handover.

Your move. Your opening.
Planned into the programme.

We coordinate the whole route to your target date, from design to handover.

Discuss my project timeline