New builds · Embrach

Rägeboge

19 homes. Timber assembly in about 2 weeks per building.

Rägeboge in Embrach brings 19 homes together across 7 timber buildings. Bächi Holzbau delivered the development as general contractor, using prefabrication to support a coordinated, efficient building programme.

Location
Embrach
Project type
New builds
Project period
2020–2022
Homes
19
Buildings
7
Timber assembly
Approx. 2 weeks per building
Delivery
General contractor
01

The brief

Deliver a residential development with individual homes and an organised construction sequence across several buildings.

02

The timber solution

Bächi Holzbau took responsibility for the complete execution as general contractor. Prefabricated timber elements supported rapid assembly: approximately 2 weeks of timber assembly per building.

03

The result for the client

19 homes were delivered within the 2020–2022 project period. Prefabrication helped save time during assembly and coordinate the sequence between buildings. The 2-week figure refers to timber assembly per building, not the entire construction period.